Water and sewer forms

Application to Disconnect Water Service

Application for an Approval to Operate an On-Site Sewage Management System

Application to Install/Alter On-site Sewage Management System

Backflow Prevention Device Application
Licensed and backflow accredited plumbers can use this form to submit a backflow prevention device test report. You will also need to pay the applicable fee and attach an inspection and maintenance form.

Backflow Prevention Device Inspection (Electronic)
Licensed and backflow accredited plumbers can use this electronic form to submit a backflow prevention device test report. You will also need to pay the applicable fee and attach an inspection and maintenance form.

Potable Water Metered Standpipe Application

Recycled Water Application- Approval for Supply By Water Tanker (Electronic)
This application must be completed before access to Council’s Recycled Water Delivery Points will be granted. Before completing the application, please read the End User Management Plan for Tanker Users

Relocation of Existing Water Service Application (Electronic)

Relocation of Existing Water Service Application (Printable)

Section 305 Application for a Section 307 Certificate - Water Management Act 2000 (Electronic)

Section 305 Application for a Section 307 Certificate - Water Management Act 2000 (Printable)

Stormwater Drainage Issue (Private Property)

Water Pressure Statement Application (Electronic)

This form is designed for use by hydraulic consultants and plumbers who want to obtain a water pressure availability and fire flow demand certificate for a property on the Central Coast.

Water Service Application (other than 20mm) Domestic Service
Please complete this form if you would like an additional water service, or a larger water service installed. Council will provide a quotation for the work to be completed. Please note: Council will permit one water meter per residential customer. If the development relates to multiple dwellings on a single lot under one ownership, only one water service / meter will be provided. The owner of such a development may choose to install a private check meter for their own administration of consumption and associated charges.

Water Service Application Single Dwelling (20mm)

Average: 1 (1 vote)

Comments

Add new comment

Last updated : Fri 24 Aug 2018