Skip to main content
Current Development Applications

Latest development applications, development consents and complying development certificates. 

For further information on the development application process or to track an application, see our plan and build section.

Development Consents

NoDateAddressSuburbDescription
309/202528-05-202513 Margherita AveBATEAU BAYDwelling Addition
316/202527-05-2025272 Booker Bay RdBOOKER BAYFront Fence
300/202528-05-20256 Mankillo WayCRANGAN BAYDwelling
1839/202329-05-20255 & 7 Melbourne StEAST GOSFORDMulti-Dwelling Housing & Demolition of Existing Structures
69/202526-05-202598 Westbrook PdeGOROKANNew Dwelling to Create Dual Occupancy & 2 Lot Subdivision
1983/202429-05-2025234 Central Coast HwyKARIONGDemolition of Existing Structures, Dwelling, Retaining Walls & Associated Works including Tree Removal
1501/202428-05-202517 Killcare RdKILLCAREAlterations & Additions
1278/202428-05-2025987 & 993A George Downes DrKULNURABoundary Adjustment
348/202528-05-202511 Narelle ClLISAROWAboveground Concrete Swimming Pool, Removal of Existing Spa & Part of Deck
489/202528-05-202543 Bloomfield StLONG JETTYDwelling
2117/202327-05-202515 Toowoon Bay RdLONG JETTYMulti-Dwelling Housing Consisting of 3 Units, Demolition of Existing Structures & 3 Lot Strata Subdivision
71/202529-05-202557 Syncarpia CrNARARADwelling
60589/202028-05-2025129 Alan StNIAGARA PARKDwelling House & Garage
77/202526-05-2025208 Steyne RdSARATOGAHome Business (Food Preparation)
343/202529-05-202544 Marana RdSPRINGFIELDSwim Spa & Retaining Walls
15/202526-05-2025148 Pacific HwyTUGGERAHRecreation Facility Consisting of Gymnasium - World Gym (Tenancy 9, Pacific Centre Business Park) & Associated Signage
548/202530-05-202552 Berith StUMINA BEACHInground Swimming Pool & Alfresco Area
103/202526-05-20251 Debenham Rd SWEST GOSFORDConstruction of 2 Units Each Comprising a Warehouse & Showroom for Use as Specialised Retail Premises & Consolidation of Lot 20 & 40
1760/202426-05-20259 Dunban RdWOY WOYAlterations & Additions to Registered Club - Canopy & Awning Extensions, Illuminated Signage, Changes to Exterior Treatment & Associated Demolition
1281/202428-05-202574 Golding GroveWYONGShed
1400/202430-05-2025118 Tuggerawong RdWYONGAHSecondary Dwelling

Development Applications 14 days

Written submissions close: 6 June 2025

NoAddressSuburbDescription
549/202584 Broken Bay RdETTALONG BEACHDual Occupancy & Demolition of Existing Structures ApplicantS Trad


Development Applications 14 days

Written submissions close: 16 June 2025

NoAddressSuburbDescription
457/2025Bay House Motel, 
61 Bateau Bay Rd
BATEAU BAYExpansion of the Use of an Existing Premises for Restaurant / Café Applicant - Corona Projects Pty Ltd 
560/20259 Tumbi Creek RdBERKELEY VALEChange of Use to Recreation Facility - 24/7 Gymnasium, Internal Alterations, Additions & Signage (Unit 2 - Anytime Fitness) Applicant Prestige Town Planning Pty Ltd
632/2024Wyong Leagues Club, 
40 Lake Haven Dr
KANWALReplacement, & Alterations & Additions to Existing Ancillary Amenity Buildings (Recreational Facility - Outdoor) (Amended Application) Applicant J Garratley
605/2025Westfield Tuggerah, 
Shop 1011, 50 Wyong Rd 
TUGGERAHReplace Signage Applicant - SLR Consulting - New Lambton

 

Development Applications 14 days

Written submissions close: 23 June 2025

NoAddressSuburbDescription
497/202539 Donald AveUMINA BEACHDemolition of Existing Structures & Dual Occupancy (Attached) Applicant - S Trad

 

Development Applications 14 days

Written submissions close: 30 June 2025

NoAddressSuburbDescription
564/202560 & 62 Showground RdGOSFORDProposed Signage on Multi- Disciplinary Health Hub Building Applicant - Cornerstone Development Management Pty Ltd 
2338/20221 Ocean StNORTH AVOCAConstruction of Dual Occupancy in Stage 1 with Torrens Title Subdivision of Dual Occupancy Development in Stage 2 (Amended Application) Applicant - Mojo Homes Pty Ltd 
639/202511 Bryant DrTUGGERAHFood & Drink Premises Extension of Hours 24/7 Applicant - HMC Capital
644/202565 Voyager StWADALBAConstruction of Attached Dual Occupancy Applicant - Hudson Homes


Development Applications 21 days

Written submissions close: 6 June 2025

NoAddressSuburbDescription
61747/2021872 Pacific HwyLISAROWProposed 2 Lot Subdivision (Amended Application) ApplicantThe Trustee For Pantsos Family Trust
1336/202310 Britannia StUMINA BEACH2 Storey Multi-Dwelling Housing including Demolition of Existing Dwelling ApplicantN A Hill Designs


Development Applications 21 days

Written submissions close: 16 June 2025

NoAddressSuburbDescription
513/20255 / 31 Bream Rd, 
31 - 33 Bream Rd
ETTALONG BEACHGable Glass Room ApplicantSpanline Newcastle
504/20252 & 4 Sinclair StGOSFORDChildcare Centre, Consolidation of 2 & 4 Sinclair Street, Demolition of Existing ApplicantPJM Gosford CC Pty Ltd 
55789/201858 - 62 Araluen DrHARDYS BAYMixed Use Development Commercial Premise & Shop Top Housing (Amended Application) Applicant - Fuse Projects Pty Ltd

 

Development Applications 21 days

Written submissions close: 23 June 2025

NoAddressSuburbDescription
567/20257 / 2 Terrigal EspTERRIGALConstruction of New Private Access Stairs to Connect the Interior of Unit 7 With its Roof Terrace Applicant - A J Whealy 
774/2018539 Pacific Hwy & 
24 Van Stappen Rd
WADALBA66 Lot Residential Subdivision, Small Lot Housing (66 Dwellings) & Associated Ancillary Works (Amended Application) Applicant - Doug Sneddon Planning Pty Ltd 

 

Development Applications 21 days

Written submissions close: 7 July 2025

NoAddressSuburbDescription
626/20254 Yeddenba AveBLUE BAYMulti-Dwelling Housing Consisting of 4 Townhouses, Strata Subdivision & Demolition of Existing Structures Applicant - NGM Long Beach Pty Ltd

 

Development Applications 28 days

Written submissions close: 30 June 2025

NoAddressSuburbDescription
582/202510 Vine StAVOCA BEACHUse of Club Space as Bar & Restaurant Applicant - Pmando Holdings Pty Ltd 

 

Development Applications 28 days

Written submissions close: 7 July 2025

NoAddressSuburbDescription
571/20251A Lucca RdWYONGConstruction of Storage Premises with Self-Storage Units & Ancillary Managers Residence Applicant - The Trustee For The Sns North Wyong Family Trust

 

Development Applications 28 days

Written submissions close: 14 July 2025

NoAddressSuburbDescription
576/2025233A Del Monte PlCOPACABANAPermanent War Memorial Applicant - Copacabana Community Association

 

Integrated Development Applications 14 days

Written submissions close: 16 June 2025

Development Application: 551/2025
Property Address: 1 Ganang St, CRANGAN BAY
Applicant: Approved Pty Ltd
Consent Authority: Central Coast Council
Proposed Development: Dual Occupancy & Subdivision
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 14 days from 30 May 2025 to 16 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from: 

  • NSW Rural Fire Service under the Rural Fires Act 1997

Integrated Development Applications 14 days

Written submissions close: 16 June 2025

Development Application: 566/2025
Property Address: 25 Willow Brook Dr, WARNERVALE 
Applicant: Thomas Paul Constructions
Consent Authority: Central Coast Council
Proposed Development: Dual Occupancy & Torrens Title Subdivision
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 14 days from 23 May 2025 to 6 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from: 

  • NSW Rural Fire Service under the Rural Fires Act 1997 

Integrated Development Applications 14 days

Written submissions close: 30 June 2025

Development Application: 570/2025
Property Address: 55 Syncarpia Cr, NARARA 
Applicant: Mr B W Field
Consent Authority: Central Coast Council
Proposed Development: Dual Occupancy & Strata Subdivision
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 14 days from 13 June 2025 to 30 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from: 

  • NSW Rural Fire Service under the Rural Fires Act 1997 

Integrated Development Applications 14 days

Written submissions close: 30 June 2025

Development Application: 561/2025
Property Address: 29 Willow Brook Dr, WARNERVALE 
Applicant: Thomas Paul Constructions
Consent Authority: Central Coast Council
Proposed Development: 2 Storey Dual Occupancy - Torrens Title Subdivision
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 14 days from 13 June 2025 to 30 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from: 

  • NSW Rural Fire Service under the Rural Fires Act 1997 

Integrated Development Applications 21 days

Written submissions close: 6 June 2025

Development Application: 501/2025
Property Address: 77-91 Warnervale Rd, WARNERVALE
Applicant: The Trustee for The Think Planners Unit Trust
Consent Authority: Central Coast Council
Proposed Development: 120 Place Child Care Centre with Ancillary Works on Approved Lots 10-14
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 21 days from 16 May 2025 to 6 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from:

  • NSW Rural Fire Service under the Rural Fires Act 1997

Integrated Development Applications 21 days

Written submissions close: 6 June 2025

Development Application: 1231/2024
Property Address: 141 & 143 Railway Rd, WARNERVALE
Applicant: A & G Hayek
Consent Authority: Central Coast Council
Proposed Development: Childcare Centre & Demolition of Existing Structures
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 21 days from 16 May 2025 to 6 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from:

  • NSW Rural Fire Service under the Rural Fires Act 1997
     

Integrated Development Applications 21 days

Written submissions close: 16 June 2025

Development Application: 369/2025
Property Address: Berkeley Village, 119A / 15 Lorraine Ave, BERKELEY VALE 
Applicant: Ausiports Pty Ltd
Consent Authority: Central Coast Council 
Proposed Development: Alterations & Additions - Glass Enclosure
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 21 days from 23 May 2025 to 16 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from:

  • NSW Rural Fire Service under the Rural Fires Act 1997

Integrated Development Applications 28 days

Written submissions close: 6 June 2025

Development Application: 264/2025
Property Address: 3 Mara Cr, MOONEY MOONEY
Applicant: P J O'Sullivan
Consent Authority: Central Coast Council
Proposed Development: Aquaculture - Addition of 3 long lines to Lot - OL89/038, Lot 123-112
Integrated Development: Fisheries Management Act

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 28 days from 9 May 2025 to 6 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from: 

  • NSW DPI Fisheries under the Fisheries Management Act

Integrated Development Applications 28 days

Written submissions close: 7 July 2025

Development Application: 440/2025- Extension of Notification Period for 28 days
Property Address: 30 Summerland Rd, SUMMERLAND POINT
Applicant: ADW Johnson Pty Ltd
Consent Authority: Central Coast Council
Proposed Development: Group Home & Ancillary Development
Integrated Development: Rural Fires Act 1997, Coal Mine Subsidence Compensation Act 2017

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.
This is an extension to the notification period, those people who have already made a submission to this development application do not need to make another submission.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval/s from:
o    NSW Rural Fire Service under the Rural Fires Act 1997
o    Subsidence Advisory NSW under the Coal Mine Subsidence Compensation Act 2017

Integrated Development Applications 28 days

Written submissions close: 14 July 2025

Development Application: 511/2025
Property Address: 90 & 94 Sparks Rd, HAMLYN TERRACE
Applicant: Universal Property Group Pty Limited
Consent Authority: Central Coast Council
Proposed Development: Small Lot Housing & Subdivision on Residue Lot 87, 
Approved under DA/1176/2017
Integrated Development: Rural Fires Act 1997

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 28 days from 13 June 2025 to 14 July 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Integrated development and requires the following approval from:

  •    NSW Rural Fire Service under the Rural Fires Act 1997

Nominated Integrated Development Applications 28 days

Written submissions close: 6 June 2025

Development Application: 1861/2024
Property Address: 65 Kanangra Dr, CRANGAN BAY
Applicant: Fernleigh Drafting
Consent Authority: Central Coast Council
Proposed Development: Ancillary Storage Structure
Nominated Integrated Development: Water Management Act 2000

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 28 days from 9 May 2025 to 6 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Nominated Integrated development and requires the following approval/s from:

  • Department of Planning and Environment (Water) under the Water Management Act 2000  

    The development is also Integrated development and requires the following approval/s from:

  • Subsidence Advisory under the Coal Mine Subsidence Compensation Act 2017 

 

Nominated Integrated & Integrated Development Applications 28 days

Written submissions close: 30 June 2025

Development Application: 545/2025
Property Address: Old Munmorah Power Station Site, 301 & 301A Scenic Dr, COLONGRA
Applicant: Generator Property Management Pty Ltd
Consent Authority: Central Coast Council
Proposed Development: Single Span Road Bridge & Realignment & Upgrade of Existing Road Connections
Nominated Integrated Development: Water Management Act 2000

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 28 days from 30 May 2025 to 30 June 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Nominated Integrated development and requires the following approval from:

  • Department of Planning and Environment (Water) under the Water Management Act 2000  

The development is also Integrated development and requires the following approval from:

  • NSW Department of Primary Industries (Fisheries) under the Fisheries Management Act 1994  
     

Nominated Integrated & Integrated Development Applications 28 days

Written submissions close:14 July 2025

Development Application: 594/2025
Property Address: 6 Albert St, EAST GOSFORD
Applicant: PMDL Architecture & Design
Consent Authority: Central Coast Council
Proposed Development: Educational Building (Construction Compound) & Demolition of Existing Compound, Awning & Cricket Nets
Nominated Integrated Development: Water Management Act 2000

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 28 days from 13 June 2025 to 14 July 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Nominated Integrated development and requires the following approval from:

  • Department of Planning and Environment (Water) under the Water Management Act 2000  

The development is also Integrated development and requires the following approval from:

  • NSW Rural Fire Service under the Rural Fires Act 1997 
     

Nominated Integrated & Integrated Development Applications 28 days

Written submissions close:14 July 2025

Development Application: 506/2025
Property Address: 130 & 140 Johns Rd, WADALBA
Applicant: The Trustee For Jadalba Unit Trust
Consent Authority: Central Coast Council
Proposed Development: Subdivision Creating 116 Residential Lots, 1 Lot Containing Stormwater Infrastructure & 1 Conservation Lot & Ancillary Works – Staged
Nominated Integrated Development: Water Management Act 2000

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 28 days from 13 June 2025 to 14 July 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Nominated Integrated development and requires the following approval from:

  • Department of Planning and Environment (Water) under the Water Management Act 2000  

The development is also Integrated development and requires the following approval from:

  • NSW Rural Fire Service under the Rural Fires Act 1997 
     

Nominated Integrated & Integrated Development Applications 28 days

Written submissions close:14 July 2025

Development Application: 569/2025
Property Address: 53 Federation Blvd & 93 Virginia Rd, WARNERVALE
Applicant: AV Jennings Pty Ltd
Consent Authority: Central Coast Council
Proposed Development: 24 Lot Subdivision
Nominated Integrated Development: Water Management Act 2000

The documents accompanying the development application are available on the Central Coast Council website www.centralcoast.nsw.gov.au for a minimum period of 28 days from 13 June 2025 to 14 July 2025. A person may, during the public exhibition period, make written submissions to the consent authority about the application and any submission must specify the grounds of objection, if any.

Submissions can be made online at www.centralcoast.nsw.gov.au or in writing to Council's postal address. Submissions will be made available for viewing on Council's website.

The development is Nominated Integrated development and requires the following approval from:

  • Department of Planning and Environment (Water) under the Water Management Act 2000  

The development is also Integrated development and requires the following approval from:

  • NSW Rural Fire Service under the Rural Fires Act 1997 
     
Central Coast Council is required to comply with the requirements of the Government Information (Public Access) Act 2019 which requires submissions on Development Applications to be published on Council’s website. In order to maintain privacy, all submissions lodged using Council’s DA Submission Form or online portal will have personal contact details and signature redacted. Submissions received not using Council’s DA Submission Form or via the online portal will be published in full. Your submission may also be reproduced in full in Council reports or in Court proceedings. 

Get email updates

Keep up to date with Council Planning News!

Sign up today to Council’s Planning E-News to find out:

  • The latest information on what’s on exhibition
  • Planning with Council
  • DAs worth over $5million

Stay up to date
Sign-up for weekly news, events and important information.